7. Electrically actuated switch-on valve
8. Pressure sensor for pressure differential monitoring
9. Microfilter insert with retained particle size 1 µm with automatic condensate
drain
10. Filter insert with retained particle size 0.01 µm with automatic condensate drain
11. Activated carbon filter no automatic condensate drain
12. Pressure regulating valve with pressure sensor for glass scales sealing air
0.6-1.0 bar
Procedure
1. Check oil level at oiler (optional).
2. Check pressure setting on pressure gauge and adjust if necessary. An
operating pressure of 6 bar has been set at the factory.
3. Check supply and fluid lines (damage and leakage). Supply and fluid lines must
be checked for damage. Pre-damage such as kinks or abrasions should be
logged and replacement should be initiated.
4.
Example: Various silencer versions from FESTO
Check silencers.
5. Drain condensate (not applicable to auto-drain).
Maintenance Summary - Care activities
12
Maintenance Instructions
G200.2
DIE078EN - 05.06.2019