8
1-7
V4
V4
V3
V3
V2
V2
A4
A4
A3
A3
A2
A2
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
1.14 KITS AVAILABLE ON REQUEST.
• System shut off valves kit. The boiler is desig-
ned for installation of system shutoff valves to
be placed on delivery and return pipes of the
connection assembly. This kit is particularly
useful for maintenance as it allows the boiler to
be drained separately without having to empty
the entire system.
• Polyphosphate dispenser kit. The polyphospha-
te dispenser reduces the formation of lime-scale
and preserves the original heat exchange and
domestic hot production water conditions.
The boiler is predisposed for application of the
polyphosphate dispenser kit.
• Connection unit kit. Includes: pipes, fittings
and cocks (including gas cock), to carry out
all connections to the boiler system.
The above-mentioned kits are supplied complete
with instructions for assembly and use.
Total head available to the plant.
Key:
Vn = Available head
An = Circulator pump absorbed power
Ci
rcu
la
to
r p
um
p a
bs
or
be
d p
ow
er (
W
)
Ci
rcu
la
to
r p
um
p a
bs
or
be
d p
ow
er (
W
)
Flow rate (l/h)
Flow rate (l/h)
H
ea
d (kP
a)
H
ea
d (kP
a)
Closed bypass
Open bypass
Summary of Contents for Nike Star 24 4 ErP
Page 18: ...18 3 4 3 2 2 4 1 INSTALLER USER MAINTENANCE TECHNICIAN ...
Page 27: ...27 ...