23
16
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
2.4 CONTROL PANEL.
2.2 CLEANING AND MAINTENANCE.
To preserve the boiler's integrity and keep the safety
features, performance and reliability, which distin-
guish it, unchanged over time, you must execute
maintenance operations on a yearly basis in com-
pliance with what is stated in the relative point at
“annual check and maintenance of the appliance”, in
compliance with national, regional, or local standards in force.
2.3 VENTILATION OF THE ROOMS.
In the room in which the boiler is installed it is necessary that at
least as much air flows as that requested for by normal combustion
of the gas and ventilation of the room. The provisions relative to
ventilation, the flue ducts and multiple flues are stated in Par.
1.11 and 1.12. If in doubt regarding correct ventilation, contact
an authorised company.
Key:
1 - Central heating temperature selector
2 - Domestic hot water temperature
selector
3 - On/Stand-by/Off Button
4 - Summer/Winter Button
5 - Reset Button
6 - Boost button
7 - Operation in summer mode
8 - Boiler in Stand-by mode
9 - Operation in winter mode
10 - Blocked boiler, it needs to be
unblocked by pressing the “RESET”
button
11 - Flame presence symbol and relative
output scale
12 - Room central heating mode func-
tioning active
13 - Solar function active
14 - Anomaly present
15 - Chimney sweep function in progress
16 - DHW production phase function active
17 - Domestic hot water temperature set
18 - Boiler connected toV2 remote control
(optional)
19 - Operation with external temperature
probe active (optional)
20 - Booster function active
21 - Central heating temperature set
22 - Boiler manometer
Summary of Contents for NIKE ECO 24
Page 2: ...2 ...
Page 39: ...39 6 6 7 8 8 f f e 22 INSTALLER USER MAINTENANCE TECHNICIAN ...
Page 50: ...50 ...
Page 51: ...51 ...