1.11 SYSTEM FILLING.

Once the boiler is connected, fill the system via 

the filling valve (Fig. 2-2). Filling is performed 

at low speed to ensure release of air bubbles in 

the water via the boiler and heating system vents. 

The boiler has a built-in automatic venting valve 

on the circulator. Open the radiator vent valves. 

Close radiator vent valves only when water es-

capes from them.

Close the filling valve when the boiler manometer 

indicates approx. 1.2 bar.

N.B.:

 during these operations start up the cir-

culation pump at intervals, acting on the main 

switch positioned on the control panel. 

Vent the 

circulation pump by loosening the front cap and 

keeping the motor running.

Tighten the cap after the operation.

1.12 GAS SYSTEM START-UP.

To start up the system, refer to the technical 

standard in force: In particular, for new gas 

systems:

- open windows and doors;
- avoid presence of sparks or naked flames;
- bleed all air from pipelines;
-  check that the internal system is properly sealed 

according to specifications.

1.13 BOILER START UP (IGNITION).

To commission the boiler (the operations listed 

below must only be performed by a qualified firm 

and without any unauthorised persons):

-  check that the internal system is properly sealed 

according to specifications

-  make sure that the type of gas used corresponds 

to boiler settings;

- check that there are no external factors that 

may cause the formation of fuel pockets;

-  switch the boiler on and check correct ignition;
- make sure that the gas flow rate and relevant 

pressure values comply with those given in the 

manual (par. 3.18);

- check the correct ventilation of the rooms;
- check the existing draught during normal 

functioning of the appliance, e.g. a draught 

gauge positioned at the exit of the appliance 

combustion products;

-  check that there is no backflow of combustion 

products into the room, even during function-

ing of fans;

- ensure that the safety device is engaged in the 

event of gas supply failure and check activation 

time;

- check activation of the main switch located 

upstream from the boiler.

The boiler must not be started up even if only 

one of the checks should be negative.

1.14 CIRCULATION PUMP.

The Mini Nike X 24 3 E series boilers are supplied 

with a built-in circulation pump with 3-posi-

tion electric speed control. The boiler does not 

operate correctly with the circulation pump on 

first speed. To ensure optimal boiler operation, 

in the case of new systems (single pipe and 

module) it is recommended to use the pump 

at maximum speed. The pump is already fitted 

with a condenser.

Pump release.

 If, after a prolonged period of 

inactivity, the circulation pump is blocked, 

unscrew the front cap and turn the motor shaft 

using a screwdriver. Take great care during this 

operation to avoid damage to the motor.

By-pass regulation (part. 20 Fig. 1-7).

 If neces-

sary, the by-pass can be regulated according to 

system requirements from a minimum (by-pass 

excluded) to a maximum (by-pass inserted) 

represented by the graphics (Fig. 1-6).

Make the regulation using a flat head screw-

driver, turn clockwise and insert the by-pass, 

anti-clockwise it is excluded.

Total head available to the system.

To

ta

l h

ea

d (m H

2

O)

Flow rate (l/h)

H

ea

d (kP

a)

  A  =  Head available to the system  

at maximum speed with  

by-pass excluded.

  B  =  Head available to the system  

at maximum speed with  

by-pass inserted.

  C  =  Head available to the system 

at second speed with by-pass 

excluded.

  D  =  Head available to the system 

at second speed with by-pass 

inserted.

1.15 KITS AVAILABLE ON REQUEST.

•  System shut off valves kit. The boiler is designed 

for installation of system interception cocks 

to be placed on flow and return pipes of the 

connection assembly. This kit is particularly 

useful for maintenance as it allows the boiler to 

be drained separately without having to empty 

the entire system.

• Polyphosphate dispenser kit. The polyphos-

phate dispenser reduces the formation of lime-

scale and preserves the original heat exchange 

and domestic hot water production conditions. 

The boiler is prepared for application of the 

polyphosphate dispenser kit.

• External storage tank unit coupling kit. If the 

production of DHW is required as well as room 

central heating, on request Immergas supplies 

a kit made up from an external cylinder unit 

and everything necessary for adaptation of the 

boiler

The above-mentioned kits are supplied complete 

with instructions for assembly and use.

Summary of Contents for 3.020857

Page 1: ...MINI NIKE X 24 3 E Instruction booklet and warning IE 1 038792ENG...

Page 2: ......

Page 3: ...ions specified in the current regulation and technical standards In compliance with legislation in force the systems must be designed by qualified professionals within the dimensional limits establish...

Page 4: ...ting 11 2 7 Boiler shutdown 13 2 8 Restore central heating system pressure 13 2 9 System draining 13 2 10 Anti freeze protection 13 2 11 Case cleaning 13 2 12 Decommissioning 13 3 Boiler start up init...

Page 5: ...e intervenes with an obstructed conveying system the safety valve must be conveyed away by a draining funnel or if there are leaks from the hydraulic connections on the contrary the manufacturer canno...

Page 6: ...order to meet the system requirements es tablished by the technical regulation in force in relation to the pollution of drinking water we recommend installing the IMMERGAS anti backflow kit to be used...

Page 7: ...directly to the outside as long as the standard regulations for the flue terminal are respected as well as the existing laws Connection to chimneys or flues The connec tion of the appliances to a chim...

Page 8: ...started up even if only one of the checks should be negative 1 14 CIRCULATION PUMP The Mini Nike X 24 3 E series boilers are supplied with a built in circulation pump with 3 posi tion electric speed c...

Page 9: ...ystem filling valve 6 Flue safety thermostat 7 Flow probe 8 Primary heat exchanger 9 Safety thermostat 10 Combustion chamber 11 Ignition and detection electrodes 12 System expansion vessel 13 Burner 1...

Page 10: ...is also prohibited in the same room as suction devices or the like at the same time as the boiler unless there are additional openings dimensioned in a way to satisfy the additional requirement for a...

Page 11: ...The flow temperature can be modified by selecting the functioning curve via buttons 5 and 6 selecting a value from 0 to 9 Fig 1 5 With external probe present the relative symbol will appear on the dis...

Page 12: ...ithout having to be reset 1 20 Parasite flame This occurs in the event of a leak in the detection circuit or an anomaly in the flame control unit Press the Reset button 1 24 Push button control panel...

Page 13: ...3 bar the safety valve may be activated In this case remove water from an air vent valve of a radiator until 1 bar is reached or ask for as sistance from an authorised company In the event of frequen...

Page 14: ...ce e g a draught gauge positioned at the exit of the appliance combustion products check that there is no backflow of combustion products into the room even during functio ning of fans ensure activati...

Page 15: ...ficiency of gas intake circuit Irregular combustion red or yellow flame When the burner is dirty or the boiler lamellar pack is blocked Clean the burner or the boiler lamellar pack Frequent interventi...

Page 16: ...boiler with storage tank 1 Lighting display Determining how to display illumination Display lighting P2 Range of values which can be set Standard setting 0 Off 1 Auto 2 On 1 Off the display is always...

Page 17: ...sure to insert the special seal rings supplied in the kit between the gas manifold and the injectors apply voltage to the appliance use the boiler push button control panel to select the gas parameter...

Page 18: ...tion phase the P C B supplies constant gas with pressure proportional to the parameter G2 set 3 10 CHIMNEY SWEEP FUNCTION When activated this function forces the boiler to variable output for 15 minut...

Page 19: ...itate boiler maintenance the casing can be completely removed as follows Fig 3 4 3 5 1 Unhook the decorative frame a from the relative lower retainers 2 Remove the decorative frame a from the casing c...

Page 20: ...20 3 5 4 4 5 6 6 d d c INSTALLATOR USER MAINTENANCE TECHNICIAN...

Page 21: ...tion time must be less than 10 seconds Visually check for water leaks or oxidation from on connections Visually check that the water safety drain valve is not blocked Check that after discharging syst...

Page 22: ...760 1 89 6 42 65 5 1 41 13 43 137 0 1 38 17 27 176 1 15 0 12900 1 77 5 70 58 1 1 32 12 00 122 4 1 30 15 43 157 3 14 0 12040 1 66 5 02 51 2 1 24 10 65 108 6 1 22 13 68 139 5 13 0 11180 1 55 4 39 44 8 1...

Page 23: ...1 20 Heat loss at flue with burner On Off 6 70 0 09 Central heating circuit max operating pressure bar 3 Central heating circuit max operating temperature C 90 Adjustable central heating temperature C...

Page 24: ...er CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum heating capacity domestic Qn min Minimum heating capacity heating Qnw max Maximum heating capacity domestic Qn m...

Page 25: ...25...

Page 26: ...26...

Page 27: ...27...

Page 28: ...Europe S r o 059051 Poprad Matejovce SK Tel 421 524314311 Fax 421 524314316 IMMERGAS SPA ITALY CERTIFIED COMPANY UNI EN ISO 9001 2015 Design manufacture and post sale assistance of gas boilers gas wat...

Reviews: