41
2 1 3 2 4
3
INSTRUCTIONS FOR MODELS:
AVIO ECO 24
NIKE ECO 24
Installation and maintenance must be performed in compliance
with the regulations in force, according to the manufacturer's
instructions and by professionally qualified staff, intending staff
with specific technical skills in the plant sector, as envisioned
by the Law.
KIT INSTALLATION.
- Remove voltage from the appliance by disconnecting the switch
upstream from the boiler.
- Disassemble the boiler casing (see instruction book relative to
the boiler model).
- Open the control panel compartment to install the relay board
(1) (see figure 3-1).
- Mount the board making the male pins (2) match the holes
in the board (1) and fix it using the cross-head screw (3) (see
figure 3-1).
- Make the electric connections between the relay board (1) and
the boiler P.C.B. (4) using the relative wiring composed of two
cables supplied with the kit. Connect the external components
according to requirements following the wiring diagrams given
on the next pages.
- Close the control panel, re-mount the casing and re-apply the
voltage to the appliance to take it back to normal functioning
conditions.
Fig. 3-1