11
7. Setting this equipment
Turning on the power
There is no power switch on this equipment. It is possible to supply power for this equipment with
the following three methods: (1) AC adapter, (2) terminal block, (3) PoE.
When the power is inserted, the LED display P (green) lights and operation starts after about 40
seconds.
7-1. Power supply with AC adapter
When supplying power to this equipment with an AC adapter, connect as shown in the figure
below. Prior to connecting, first make sure that no power is being supplied to the equipment with
another method.
AC adapter
DC12V
• Use an AC adapter attested in UL1310 and CSA-C22.2 No.223.
• Use an AC adapter which outputs DC12V/1A.
• Do not use simultaneously with terminal block 2.
• When power has been supplied simultaneously with PoE, the method that was turned on first
has priority.
7-2. Supplying power from terminal block 2
It is possible to supply DC12V or AC24V power from terminal block 2. When supplying power to
this equipment from terminal block 3, connect as shown in the figure below. Prior to connecting,
first make sure that no power is being supplied to the equipment with another method.
When supplying DC12V.
〜
+
−
DC12V
When supplying AC24V.
〜
+
−
+
-
〜 AC24V
Summary of Contents for IEN-10
Page 29: ......