(C) IDM ENERGIESYSTEME GMBH
5. Installing the hot water station 2.0
Installation instructions Hygienik 2.0
28
Installing the hot water station 2.0
C
h
a
p
te
r 05
5.5. Installing the heat meter
An optional heat meter (Art. No. 173534) can be installed with the 25l and 35l hot water stations.
Remove the brass pipe from the tank return and insert the metering unit of the heat meter.
The temperature sensor of the heat meter is installed in the tank
fl
ow.
The mount for the operating unit is attached at the side.
The operating unit is attached with a screw-on connec-
tion.
Brass pipe
Metering unit
Temperature sensor
Mount
Operating unit