(C) IDM ENERGIESYSTEME GMBH
Installation instructions AERO SLM
25
transport
El
e
ktrisc
h
e
r Ansc
hluss
In order to avoid damages during transport, the heat
pump should be transported to its
fi
nal installation
site in packed condition on the wooden palett with a
forklift or hand lift truck.
The components and the tubing of the heating- and
heat source site must never be used to transport the
heat pump. When the heat pump is lifted from the
wooden palett, there is a risk of tilting. Therefore, the
device must be lifted and secured with a su
ffi
cient
number of persons. The weight of the heat pump
must be considered!
Transport of the Indoor unit via stairways
The heat pump can be lifted down the stairways step
by step with a sack barrow. A su
ffi
cient number of
persons for securing the device during the transport
shall be present. If the heat pump must be transported
without the wooden pallet and the protective wooden
crate, it is important that there will be no damage on
the housing.
Transport of the outdoor unit
The outdoor unit should be transported as far as
possible to its place of
fi
nal installation site. It is re-
commended to remove the protective wooden crate
only on site. The device must be lifted and secured
with a corresponding number of people. To avoid
injuries during the transport of the outdoor unit, it is
recommended to use work gloves and safety shoes.
Whether the cover of the outdoor unit must be dis-
mount for the transport or maintenance work, the
fi
xing screws must be loosen. After that the cover can
be unhinged and removed.
4. Transport
Transport possibility of the AERO SLM indoor unit
Loosen the
fi
xing screws on the outdoor unit
Transport with Hand lift truck
Transport with fork lift
When transporting, the AERO SLM may not be tilted more than 30°!