
(C) IDM Energiesysteme GmbH
Installation instructions AERO ILM
29
Installation
5.9.4. Assembly instructions air outlet
The wall connection site on the outlet side consists of
the outlet panel and the already a
ffi
xed cellular rubber
to ensure a watertight transition on the outlet side.
The outlet panel is equipped with a trapeze-shaped
insulation with adhesive tape on both sides. This has
to be a
ffi
xed on the evaporator side (to the left or to
the right) to the panel.
The outlet panel is mounted to the desired side us-
ing the 4 screws which are included in the delivery
contents.
Before positioning the machine in the corner, it is
necessary to check whether the wall opening has
been insulated by the building contractor with a 50
mm insulation. The machine can then be positioned
in the corner.
If there is any gap at the outlet or inlet opening due to
any
fl
oor unevenness, this can be corrected using the
adjustable machine feet.
Example outlet side on the right
Example of outlet side o the right
The screws on the panel have to be
carefully tightened manually.
The panel opposite the outlet side is also equipped
with a trapeze-shaped insulation with adhesive tape
on both sides. This insulation has to be a
ffi
xed on the
condenser side.