(C) IDM Energiesysteme GmbH
5. General description
Installation instructions AERO ILM
24
Installation
The following shall be taken into account:
•
Occurring obstructions and their e
ff
ect
• Object
re
fl
ections
• Ground
re
fl
ections
•
Absorption caused by plants
• E
ff
ect of wind and temperature layers
10m
10m
5m
5m
5.6. Decoupling of buildings
If vibrations of the heat pump are transmitted via
fl
oors, ceilings, walls or other solids, this is referred to
as structure-borne noise. In order to minimize this in,
heat pumps should be decoupled from the structure
in so far as possible. The installation of heat pumps
on ceilings or
fl
oors in lightweight construction should
be principally avoided. In the case of
fl
oating
fl
oor
screed the
fl
oor screed and impact sound insulation
should be omitted around the heat pump (as shown
in the illustration).
1
2
3
4
5
1. concrete floor
2. i
m
pact sound insulation
3. floor screed
4. cut
5. Sound reduction
m
at
To the heat pump are enclosed two sound insulation
mats. If the heat pump is at the
fi
nal installation site,
the mats must be placed under the heat pump. For
this purpose, the four feet can be adjusted in height.
view from above
adjustable
feet of the
heat pump