
Installation and Maintenance Guide for IDI Suspension System mounted to Canon DST-1000A Rails
L240-1429 REV A Image Diagnostics, Inc.
Page
12
END-LOAD MONITOR MOUNT CARRIAGE
1.
Remove packaging material from the carriage assembly.
2.
Using a Hi-Jack or other suitable lift table, raise carriage (while it is still attached to pallet) up
and slide its wheels into the open end of the IDI Cross Rails.
Make sure all carriage wheels
are engaged onto rails before lowering Hi-Jack.
3.
Remove pallet and shipping bars from support unit.
4.
If a Stationary/Mobile Cable Handling Assembly is going to be used with this suspension
system, then mount them at this stage. (Refer to instructions on pages 17-19)
5.
Install the second Cross Rail End Plate on the open end of the IDI Cross Rails, making sure
the rubber bumpers face in towards the carriage. (See Figure 5 for reference) Use Loctite #242
on all threads.
WARNING!
Failure to install both rail end plates may
result in serious injury to user and damage to
the equipment.