16
Harrier GTE -
Installation & Servicing
INSTALLATION
21 ASSEMBLING THE FRONT SECTION AND PULLING UP COMPLETE ASSEMBLY
1. Remove the M12 nuts and washers
from the front end of the threaded rods
and slide backwards.
2. Complete the assembly with the front
section.
3. Insert the assembly tool through the
nipples and tighten.
4. Slide the threaded tie rods through the
front section and tighten to secure the
complete assembly.
5. Clean off any surplus silicone.
6. Remove the assembly tool.
7. Level the boiler by adjusting its feet.
22 PREPARATION FOR FITTING THE FLUE CLEANOUT AND BURNER DOORS
FOR RH OPENING
1. Screw in and tighten all the studs in
the appropriate tappings as shown
for items A and B.
2. Position the burner door hinge
bracket and secure with two M12
nuts and washers.
3. Position the burner door catch and
secure with two M12 nuts and
washers.
Note.
For LH opening, exchange the
position of the catch and hinge
bracket.
24
har5994
1
4
7
4
4
1
4
3
3
2
M12
M12
M12
M12 x 50
M12 x 80
M12
4x
8x
4x
har
5995
A
A
B
B
B
C
C
B
B
A
B
C
B
A
B
B
B
A
C
C
3
2
1
INST
ALLA
TION