ERP DATA
The code of practice for the installation,
commissioning & servicing of central
heating systems
WEEE DIRECTIVE 2012/19/EU
Waste Electrical and Electronic Equipment Directive
• At the end of the product life, dispose of the packaging
and product in a corresponding recycle centre.
• Do not dispose of the unit with the usual domestic refuse.
• Do not burn the product.
• Remove the batteries.
• Dispose of the batteries according to the local statutory
requirements and not with the usual domestic refuse.
MODEL
SYMBOL
UNITS
30 kW
35 kW
Condensing Boiler
n/a
n/a
yes
yes
Low Temperature Boiler
n/a
n/a
no
no
B1 Boiler
n/a
n/a
no
no
Cogeneration Space Heater
n/a
n/a
no
no
Equipped with a Supplementary Heater
n/a
n/a
no
no
Combination Heater
n/a
n/a
yes
yes
Nominal Heat Output for Space Heating
Full Load
P4
kW
24.3
24.3
Part Load
P1
kW
8
8
Auxiliary Electricity Consumption
Full Load
elmax
kW
0.028
0.028
Part Load
elmin
kW
0.009
0.026
Standby
PSB
kW
0.003
0.002
Seasonal Space Heating Energy Efficiency
Full Load
ƞ4
%
90
90
Part Load
ƞ1
%
98.6
98.6
Standby Loss
Pstby
kW
0.05
0.05
Ignition
Pign
kW
0
0
Emissions NOx (Gross)
NOx, pond Hs
mg/kWh
25
30
Annual Energy Consumption
QHE
GJ
75
75
Sound Power Level, Indoors
LWA
dB
46
46
Domestic Hot Water
Domestic Hot Water
Qelec
kWh
0.133
0.137
Water heating energy efficiency (Eco) Tapping Profile L
ƞWH
%
81
79
Daily fuel consumption 24hr (GCV) Actual measured
Qfuel
kWh
14.84
15.14
Annual electricity consumption
AEC
kWh
28
29
Annual fuel consumption
AFC
GJ
11
11
2
Installation and Servicing