background image

22

 British Gas RD1

 

Installation & Servicing

INSTALLATION

L

N

L

N

N

EC2

EC1

Terminal block
switch live

Terminal block
permanent live

Clock

Room thermostat

Cla 1792

33 EXTERNAL CONTROLS

The wiring diagrams illustrated in Frames 35-37 cover the
systems most likely to be fitted to this appliance.

For wiring external controls to the boiler, reference should
be made to the system wiring diagrams supplied by the
relevant manufacturer, in conjunction with the wiring
diagrams shown in Frames 35-37.

Difficulty in wiring should not arise, providing the following
directions are observed:

1. Preferred wiring method.

Controls that switch the system on or off, e.g. a time
switch, must be wired, in series and terminate with a volt
free contact across EC1/EC2.

2. Alternative wiring method.

A switched live supply may be connected to EC1
(leaving EC2 without connection), which must be fused
at 2A Maximum.

IMPORTANT.
A link wire between terminals EC1 and EC2 is not
acceptable.

Notes.
a. 
Route the cable to terminal EC1 and EC2 from the

RHS of the boiler.

b. The terminal plate may be unscrewed from the
controls support to improve access for connection.

3. Controls that override an on/off control, e.g. frost

thermostat must be wired, in parallel, with the control(s)
to be overridden.  Refer to Frame 38.

4. If a proprietary system is used, follow the instructions

supplied by the manufacturer.

Advice on required modifications to the wiring may be
obtained from the component manufacturers.

Volt Free Contacts

If switched live is connected here (EC1) leave other terminal without 

connection. If programmer is used here (EC1) the switched live MUST 

BE FUSED AT 2A MAXIMUM.

Detection 

HSI

Return 
sensor

sensor

Flow

Flue 

sensor

All EARTHS must be connected 

(Not all earths are shown for clarity)

Boiler control
potentiometer

NEW

Modem

LED 1 LED 2

LED 3

LED 4

Fuse

L

Mains

L

L

N

N

N

Cla 61

18

pk

y

w

Fan      

Gas 

valve

Air pressure switch

Pump

NC

NO

com     

pk

y r

bk

r

w w

b br

EC1 EC2

O/heat thermostat

Reset

Link

gy w y y

or or

r

r

r

r

b

b

w

w

LEGEND
b

blue

bk black
br brown
r

red

y

yellow

white

32 FLOW WIRING DIAGRAM

gy grey
or orange
v

violet

pk pink
g/y green/yellow

L

N

L N

EC2

Terminal block
switch live

Terminal block
permanent live

Clock

Room thermostat

EC1

2A

Cla 1793

5. On completion of all wiring connections, relocate the control

box and secure.

Notes.
1.

Connection between a frost thermostat and the time control
should be made without disturbing other wiring.

2.

A frost thermostat should be sited in a cool place in the house,
but where it can sense heat from the system.

Preferred Wiring Method.

Alternative Wiring Method.

INST

ALLA

TION

Summary of Contents for RD1

Page 1: ...Scottish Gas RD1 the wall hung boiler Wall hung gas fired fanned flue boiler Installers guide to central heating boilers SERVICING RD109 RD112 RD115 RD118 RD121 RD124 RD130 See reverse for RD1 Users G...

Page 2: ...d boiler ensuring totally calm operation and quiet running whatever the system demands Complete range There are 7 models in the range All models include a Downward Routing Pipe Kit and an overheat the...

Page 3: ...ater head m ft 0 45 1 5 Electrical supply 230 V 50 Hz Boiler power consumption 150W Fuse rating External 3A Internal F2A to BS 4265 Water content litre gal 2 7 0 6 3 65 0 8 4 65 1 0 4 65 1 0 Dry Weigh...

Page 4: ...stination Countries GB Natural Gas only Data Badge Top of Controls Support Models G C Appliance No RD109 41 397 56 75 RD112 41 397 57 76 RD115 41 397 58 77 RD118 41 397 59 78 RD121 41 397 60 79 RD124...

Page 5: ...6798 Installation of gas fired hot water boilers of rated input not exceeding 60 kW BS 5449 Forced circulation hot water systems BS 5546 Installation of gas hot water supplies for domestic purposes 2...

Page 6: ...can be installed from inside the building Installation from inside ONLY b If a core boring tool is to be used inside the building the space in which the boiler is to be installed must be at least wide...

Page 7: ...er is adequate to deal with the rate of gas supply required A MINIMUM pressure of 20 mbar MUST be available at the boiler inlet with the boiler operating Installation pipes MUST be fitted in accordanc...

Page 8: ...s MUST be situated outside of the bathroom Note Where a room sealed appliance is installed in a room containing a bath or shower then the appliance and any electrical switch or appliance control utili...

Page 9: ...a domestic circulator capable of providing an 11 C 20 F temperature differential e g Grundfos UPS 15 50 or equivalent The vertical distance between the pump and feed expansion cistern MUST comply with...

Page 10: ...he filling point and should preferably be connected at the same point as the expansion vessel 4 Expansion Vessel a A diaphragm type expansion vessel must be connected at a point close to the inlet sid...

Page 11: ...valve and a stop valve with an automatic air vent connected between them the stop valve being located between the system and the automatic air vent The stop valve may remain open during normal operati...

Page 12: ...e Gravity horizontal pipes should be ABOVE ceiling level and as SHORT as possible A MINIMUM inclination of 25mm per 3m run 1 per 10 is required to avoid air locks If these conditions cannot be met pum...

Page 13: ...l mounting template Wall mounting plate Side outlet terminal mounting plate Flue extension tube Boiler sealing ring Flue elbow Downward routing pipe kit Boiler Hardware Pack Contents 50mm x No 14 wood...

Page 14: ...applicable the extension flue box es 10 PACKAGING AND CASING REMOVAL 11 DOWNWARD ROUTING PIPE KIT Product Qty Downward pipe routing bracket 2 off M8 Spacing pillar 1 off M5 Spacing pillar 1 off Panel...

Page 15: ...h the support bracket It is MOST IMPORTANT that the boiler is installed in a vertical position Flue length mm Accessories Product No Up to 600 B Pack 1 off 150 308 600 to 1550 B Pack 1 off D Pack 1 of...

Page 16: ...d in a separate kit must be used These brackets are secured to the wall mounting plate and it is essential to use only those holes as shown on the wall mounting template 1 An optional flue duct extens...

Page 17: ...Flue extension ducts 1 Cut the flue hole preferably with a 125mm 5 core boring tool ensuring that the hole is square to the wall If the hole has been accurately cut with a drill then making good the...

Page 18: ...e outer flue duct This ensures correct alignment of the flue terminal 4 Stick the self adhesive foam strip provided in the hardware pack onto the flue immediately behind the boiler sealing ring 21 FIT...

Page 19: ...ation Remove the blanking plate from the direction required and use this to blank off the rear outlet Side and rear flue 2 Lift the boiler onto the wall mounting plate hooks as shown Do not use the bu...

Page 20: ...50 B Pack 1 off D Pack 1 off see Frame 12 1550 to 2500 B Pack 1 off D Pack 2 off see Frame 12 2500 to 3000 B Pack 1 off D Pack 3 off see Frame 12 Note Side flue shown 26 FLUE EXTENSION DUCTS For flue...

Page 21: ...Hz is required All external controls and wiring must be suitable for mains voltage Wiring should be in 3 core PVC insulated sheathed cable not less than 0 75mm2 24 x 0 2mm to BS 6500 Table 16 Wiring R...

Page 22: ...e wired in parallel with the control s to be overridden Refer to Frame 38 4 If a proprietary system is used follow the instructions supplied by the manufacturer Advice on required modifications to the...

Page 23: ...w or or r b b r r w w b br y y y g y g y g pky w pk y r r r w y g 34 PICTORIAL WIRING IMPORTANT No system controls to be wired in this mains supply Notes 1 Some earth wires are omitted for clarity En...

Page 24: ...terminals on thermostats see the manufacturer s literature 3 This is a fully controlled system set the boiler thermostat to maximum 4 Switchmaster Smiths valves are similar but note that the GREY wire...

Page 25: ...should suffice for all systems which do not use the OFF terminals of the programmer Diagram B shows a change over frost stat which will cover most systems which do use CH OFF If however on such a sys...

Page 26: ...wing the control box back into its working position 6 Switch the electricity supply ON and check that all external controls are calling for heat 7 Press the boiler reset switch H and the overheat ther...

Page 27: ...yourself or alternatively offer to the customer the benefits of the British Gas Services details of which are outlined in the household pack supplied with this boiler After completing the installatio...

Page 28: ...burner downwards to disengage the retention tab Remove the burner to a safe place for inspection and cleaning 2 Remove the fixing screws and swing the control box down into the servicing position Ref...

Page 29: ...elbow and flue connector Disconnect the flue connector from the elbow and slide into the flue Remove the flue elbow 5 Disconnect the silicon rubber tube from the rear of the collector hood 6 Slacken t...

Page 30: ...led in Frame 48 and ensuring that there is an inlet pressure of 20 mbar available the pilot does not light then contact British Gas Services Relight in accordance with Initial Lighting Frame 40 52 SIG...

Page 31: ...of the switch 12 Press in the 2 side retaining clips and remove the switch 13 Replace and reassemble in reverse order 14 Check the operation of the boiler 54 CONTROL POTENTIOMETER THERMISTOR SENSOR LE...

Page 32: ...he burner 4 At this stage the main burner injector can be removed checked cleaned or replaced as required Ensure that an approved jointing compound is used sparingly 5 Fit the new burner ensuring that...

Page 33: ...withdraw from the control box 6 Fit the new PCB and reassemble in reverse order 7 Check the operation of the boiler Fuse To change the fuse prise the top off the holder and disengage the fuse Refer t...

Page 34: ...6 3 Drain the system 4 Disconnect the water connections If compression fittings are used then cut the pipes both above and below the fittings in order to allow the heat exchanger assembly to be remove...

Page 35: ...S NO Change pressure switch Is fault corrected Is the boiler casing correctly fitted Does the main burner light NO YES YES Does the hot surface igniter turn off NO Is there a gas supply to the boiler...

Page 36: ...17 Detection electrode complete with lead and backnut 410 mm lg 1 171 442 18 1 Hot surface igniter RD109 112 1 171 973 18 2 Hot surface igniter RD115 118 121 124 130 1 171 490 19 E58 681 Control box a...

Page 37: ...ARTS LEGEND Numbers up to 51 relate to the B G spares list 10 Burner manifold 11 Air box and pilot assembly 12 Main burner 13 Main burner injector 67 BURNER ASSEMBLY Exploded View 16 Pilot shield 17 G...

Page 38: ...OF PARTS LED 1 LED 2 LED 3 LED 4 23A Fuse 21A Cla 2710 58A 26 LEGEND 19 Control box 21A Thermostat potentiometer 26 Thermostat knob 23A Printed circuit board 58A Lockout reset switch 68 CONTROL BOX E...

Page 39: ...British Gas RD1 Installation Servicing 39 NOTES...

Page 40: ...by Ideal Boilers British Gas Services Limited Registered in England No 3141243 Registered Office Millstream Maidenhead Road Windsor Berkshire SL4 5GD British Gas Services Ltd has made every effort to...

Reviews: