14
British Gas RD1
-
Installation & Servicing
INSTALLATION
1. Unpack the boiler.
2. Remove the casing as follows and place to one side to
avoid damage.
a. Undo the 2 casing screws (a) retaining the casing to
the back panel.
b. Swing the bottom of the boiler casing up until the
controls support casing has cleared the controls then
unhook the top from the back panel.
3. Remove the boiler from its packaging base. The boiler
may now be stood upright on its controls support
protection frame to ease handling and installation.
4. Unpack the boiler terminal box and, if applicable, the
extension flue box(es).
10 PACKAGING AND CASING REMOVAL
11 DOWNWARD ROUTING PIPE KIT
Product
Qty
Downward pipe routing bracket ........................................................ 2 off
M8 Spacing pillar ............................................................................... 1 off
M5 Spacing pillar ............................................................................... 1 off
Panel rear assembly .......................................................................... 1 off
M5 x 10 Pozi hex. hd. ........................................................................ 2 off
Cla 1379
1. If it is intended to route the flow and return pipe work
downwards between the back of the boiler and the
wall the Downward Pipe Routing Kit must be fitted
before proceeding further.
2. Prepare the boiler for installation according to the
Installation and Servicing book, Frames 1-7.
3. Screw the panel rear assembly (supplied in the kit)
to the back of the boiler controls compartment.
4. Proceed with the installation with particular
reference to Frames 12, 15, 16, 18, 22 and 23.
Clas 1384