5
Mexico Super RS 3/60P - 3/100P -
Installation
GAS SAFETY
Gas Safety (Installation and Use) Regulations 1994,
amendments 1996 or rules in force.
It is law that
all
gas appliances are installed by a CORGI
registered installer (identified by
) in accordance with the
above regulations. Failure to install appliances correctly could
lead to prosecution. It is in your own interest, and that of safety,
to ensure the law is complied with.
The installation of the boiler MUST also be in accordance with
the latest I.E.E (BS 7671) Wiring Regulations, local building
regulations, bylaws of the local water authority, the Building
Regulations and Building Standards (Scotland) and any relevant
requirements of the local authority.
Detailed recommendations are contained in the following British
Standard Codes of Practice:
BS. 6891
Low pressure installation pipes.
BS. 6798
Installation of gas fired hot water boilers of rated
input not exceeding 60 kW.
BS. 5449:1
Forced circulation hot water systems (small bore
and microbore domestic central heating systems).
BS. 5546
Installation of gas hot water supplies for domestic
purposes (2nd Family Gases).
BS. 5440: 1
Flues for gas appliances of rated input not
exceeding 60 kW.
BS. 5440: 2
Ventilation for gas appliances of rated input not
exceeding 60 kW.
BS 7593
Treatment of water in Domestic Hot Water Central
Heating Systems.
Health and Safety Document No. 635.
The Electricity at Work Regulations, 1989.
1 BOILER WATER CONNECTIONS
GENERAL
Manufacturer’s notes must NOT be taken in any way as
overriding statutory obligations.
IMPORTANT.
These appliances are certificated by the British
Standards Institution for safety and performance. It is important,
therefore, that no external control devices, e.g. flue dampers,
economisers etc., are directly connected to these appliances
unless covered by these Installation and Servicing Instructions
or otherwise recommended by
Caradon Plumbing Ltd.
in
writing. If in doubt please enquire.
Any direct connection of a control device not approved by
Caradon Plumbing Ltd.
could invalidate the BSI Certification
and the normal appliance warranty. It could also infringe the Gas
Safety Regulations and the above regulations or other statutory
requirements.
LOCATION OF BOILER
The boiler must be installed on a flat and level floor, capable of
adequately supporting the weight of the boiler and any ancillary
equipment.
The boiler may be fitted on a combustible floor.
Insulation is not necessary, unless required by the local
authority.
The boiler must not be fitted outside.
Timber Framed Buildings
If the boiler is to be fitted in a timber framed building it should be
fitted in accordance with the Institute of Gas Engineering
document IGE/UP/7:1998.
1.
This appliance is NOT suitable for use in a direct hot water
system.
2.
If the boiler is to be used on a sealed system, an
Overheat
Thermostat Kit
is available which must be installed in
accordance with the instructions supplied with the kit.
Boiler
Dimension A
RS 3/60 P
218mm (8
5/8
")
RS 3/75 P
RS 3/100 P
291mm (11
1/8
")