55
SERVICING
ESPRIT 2 -
Installation and Servicing
1.
Refer to Frame 57.
2.
Swing the control box down into the servicing
position. Refer to Frame 51.
3.
Drain the boiler. Refer to Frame 77.
4.
Remove divertor valve actuator. Refer to Frame
67.
5.
Remove condensate “S” trap. Refer to Frame 69.
6.
Remove the 2 allen screws securing the plate
heat exchanger to the brass housings.
7.
Manoeuvre the plate heat exchanger out of the top
left-hand side of the controls area.
8.
Fit the new plate heat exchanger, using the new o-
rings supplied.
9.
Reassemble in reverse order.
10.
Refill the boiler. Refer to Frame 36.
11.
Check operation of the boiler. Refer to Frames 45
& 46.
79
DHW PLATE HEAT EXCHANGER REPLACEMENT
80
PUMP HEAD REPLACEMENT
1.
Refer to Frame 57.
2.
Drain the boiler CH circuit. Refer to Frame 77.
3.
Swing the control box down into the servicing
position. Refer to Frame 51.
4.
Disconnect the electrical lead from the pump.
5.
Remove the 4 Allen screws retaining the pump
head.
6.
Remove the pump head.
7.
Fit the new pump head.
8.
Reassemble in reverse order.
9.
Refill the boiler. Refer to Frame 36.
10.
Check operation of the boiler. Refer to Frames 45
& 46.
SER
VICING
206091-1.pmd
26/05/2010, 16:09
55