44
SERVICING
ESPRIT 2 -
Installation and Servicing
55
CLEANING THE HEAT EXCHANGER
Reassemble the boiler in the following order:
1.
Refit the condensate ‘S’ trap, ensuring that it is full of water.
2.
Refit the sump cover.
3.
Refit the electrodes. (Check dimensions; Frames 63 & 64).
4.
Refit the burner.
5.
Refit the fan / venturi assembly.
6.
Reconnect the fan electrical lead.
Note: Ensure the sump is fully drained before removal.
1.
Remove ignition and flame detection electrodes. Refer to
Frames 63 & 64.
2.
Remove the 3 screws retaining the sump cover and
remove.
3.
Using a suitable tool as supplied in the standard British
Gas flue brush kit, clean between the heat
exchanger
fins from the top of the heat exchanger.
4.
Access to the base of the heat exchanger is now possible.
Brush clean any deposits from the base of the heat
exchanger and remove any loose deposits from the sump.
5.
Inspect the ignition and detection electrodes. Ensure that
they are clean and in good condition - replace if necessary.
6.
Check the condition of the combustion chamber insulation.
Any cracked or damaged pieces must be replaced.
Note.
Take care not to disturb the ionisation probes at the
front and rear of the combustion chamber.
7.
Check that the ignition and detection gaps are correct.
Refer to Frames 63 & 64.
7.
Refit the boiler sealing panel.
IMPORTANT.
Ensure that the boiler sealing panel is correctly fitted and
that a good seal is made.
8.
Swing the control box back into its working position and
secure.
9.
Refit the display unit.
10.
Refit the boiler front and bottom panels.
11.
Turn on the gas supply at the gas service cock.
12.
Reconnect the electrical supply.
56
REASSEMBLY
Note: Ensure the condensate trap is
fully drained before removal.
1.
Swing the control box down into the
servicing position. Refer to Frame 51.
2.
Disconnect the condensate drain pipe.
3.
Remove the 2 screws and pull the trap
down and forward to remove.
4.
Flush out any deposits with clean
water.
54
CLEANING THE CONDENSATE 'S' TRAP
nm7401
2
Sump cover
3
Ionisation
probes
Heat exchanger
ispfu9796
SER
VICING
206091-1.pmd
26/05/2010, 16:09
44