32
Buccaneer GTE -
Installation & Servicing
INSTALLATION
53 EXAMPLE OF INSTALLATION
32
17
27
29
9
30
a
b
c
d
e
20 mm
(54)
28
57
56
buc5539
9.
Stop valve
17.
Drain valve
27.
Non-return valve
28.
Cold water inlet
29.
Pressure reducer
30.
Safety unit set to 7 bars
a.
Cold water inlet including a non-return valve
b.
Connection to the calorifier cold water inlet
c.
Stop valve
d.
Safety valve and manual drain
e.
Drain orifice
32.
Domestic hot water loop pump (optional)
54.
YA type pressure change (health regulations)
56.
Return circulation loop
57.
Domestic hot water outlet.
54 PACKAGING
The following table shows the box numbers included with the boiler to be installed.
Boiler
GTE
4/160
GTE
5/160
GTE
5/250
GTE
6/160
GTE
6/250
FM 2
Boiler
body
FM 3
FM 3
FM 4
FM 4
FM 11
Jacket and
Insulation
FM 12
FM 12
FM 13
FM 13
FM 126
Control Panel
FM 126
FM 126
FM 126
FM 126
AD 212
Domestic Hot
Water Sensor
AD 212
AD 212
AD 212
AD 212
BH 73
-
Hydraulic Connection
Kit
Boiler/Tank
BH 73
-
-
BH 75
BH 73
-
-
BH 75
BH 103
-
Domestic Hot
Water Calorifier
- L160
or
- L250
BH 103
-
-
BH 104
BH 103
-
-
BH 104
buc5540
COMBINA
TION BOILERS COMBINA
TION BOILERS
Summary of Contents for Buccaneer GTE 5
Page 1: ......
Page 38: ...38 Buccaneer GTE Installation Servicing NOTES...
Page 39: ...39 Buccaneer GTE Installation Servicing NOTES...