6. Installation
6.1 Preparation and equipments before installation
Please buy following spare parts from your local market
before installation
Besides general implements, other implements are needed
when connecting the pipe
Hung bolts M12, 4 pcs
Acetylene cylinders, oxygen cylinders (when longer pipe used
it should be welded)
Drainage pipe PVC
One set pipe cut machine. (cut copper pipe)
Copper connecting pipe
Refrigerant cans, electronic balance (when longer pipe used
additional gas should be charged)
Adhesive belt (big size) 5 pcs, (small size) 5 pcs
Pressure gauges, pipe clamp, welding torch, 2B silver
electrode
Heat insulation material used to connect copper pipe (PE
foam material, its thickness is more than 8mm)
Wrench 2 pcs, one of them is with adjustable torque wrench
(42N.m,65N.m,100N.mm)
Power cable, electrical wire between indoor and outdoor
unit(Must be in accordance with the wire diameter in the
wiring diagram)
Nitrogen cylinder (in order to prevent oxidation when welding,
using Nitrogen to replace the air)
6.2 The distance between indoor unit and obstacle
6.3 Indoor unit suspension
◇
Select the suspension foundation
◇
The suspension foundation is a structure of either wooden frame or
reinforced concrete. It must be firm and reliable to bear
at least 4 times
weight of itself and capable of bearing vibration for long periods;
Fixing of suspension foundation
◇
Fix the suspension bolts either as shown in the picture or by a steel or
wooden bracket;
◇
Adjust the relative positions of the suspension hooks to ensure the indoor
unit is level in all directions. Use a spirit level to ensure this, otherwise
Summary of Contents for ICC(ICA)-**HR-SA6-NI
Page 1: ......
Page 3: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ...21 ...
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ...50 ...
Page 51: ...54 ...
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 67: ...540 760 111 539 257 287 322 130 300 326 590 800 540 4 10 19 370 ...
Page 68: ...130 370 4 10 19 540 800 690 326 300 606 332 400 354 11 71 903 857 ...
Page 69: ...148 1255 180 945 413 373 4 10 19 585 340 ...
Page 72: ...152 ...
Page 73: ......
Page 74: ......
Page 104: ...186 7 Failure analysis Wired controller communication failure ...
Page 105: ...187 Communication failure between indoor and outdoor unit ...
Page 106: ...188 Outdoor protection phase sequence ...
Page 107: ...189 Cooling high pressure protection ...
Page 108: ...190 Heating high pressure protection ...
Page 109: ...191 Cooling low pressure protection ...
Page 110: ...192 Heating low pressure protection ...
Page 111: ...193 Cooling exhaust temperature protection ...
Page 112: ...194 Heating exhaust temperature protection ...
Page 113: ...195 Refrigerant shortage or four way valve failure protection ...
Page 114: ...196 Sensor failure protection ...
Page 115: ...197 No action after power on ...
Page 116: ...198 Poor effect ...
Page 117: ...199 ...
Page 118: ...200 Abnormal sound or viberation ...
Page 119: ...201 ...
Page 120: ...202 Abnormal odor ...
Page 121: ...203 Air switch action when air conditioner starting up ...
Page 122: ...204 Air conditioner water leakage ...