7
2
2. See the inset drawing. Orient the Handlebar
Post (7) so that the lower slot (A) is on the side
shown.
Next, loosen the indicated Post Knob (100)
and insert the Handlebar Post (7) all of the way
into the Frame (1). Make sure that the indi-
cated slots (B) are aligned. Then, tighten the
Post Knob.
Then, insert the end of the Lower Wire (122) into
the Frame (1) and the Handlebar Post (7), and
pull it out of the upper slot (C) in the Handlebar
Post as shown by the dashed line at the right.
100
100
7
A
C
D
B
1
7
7
1
3
3. IMPORTANT: To prevent the Lift Cylinder (not
shown) inside the Handlebar Post (7) from
moving, make sure that the Post Knob (100)
is firmly tightened.
See the inset drawing. Loosen the indicated
shipping screw (D) a quarter of a turn. You
should now be able to turn the shipping screw
easily with your fingers. If the shipping screw
does not turn easily, tighten the Post Knob
(100) again. Then, remove and discard the
shipping screw.
Then, insert the Handlebar (97) into the
Handlebar Post (7). Attach the Handlebar with
four M8 x 12mm Patch Screws (93); start all of
the Patch Screws, and then tighten them.
97
7
93
93
122
100