First line printing
This adjustment uses T&D09 to locate the first print-line, using the operator panel.
Service check
The Vert and Load values should be zero, and the first line on the print test should be below the perforation.
Adjustment
1. Run the T&D program in single test mode.
v
See Running the test and diagnostic (T&D) programs.
2. Scroll to T&D09
Paper feed belt
Service check
1. Turn off the printer.
2. Remove the printer covers (see Service position).
3. Remove the rear tractor assembly.
4. Use a push-pull scale (IBM P/N 460870, or equivalent) to push on the lever to verify that the tension on the
belt is between 0.55 and 0.75 kg (1.2 - 1.6 lb).
Chapter 5. Removals, service checks and adjustments
165
Summary of Contents for V03
Page 24: ...Reference table 8 ribbon lift and 26 pin cable connectors 93 Chapter 1 Diagnosing problems 24...
Page 138: ...Operator panel cable wiring Chapter 3 Wiring diagrams 138...
Page 144: ...Tractor assembly cable wiring Chapter 3 Wiring diagrams 144...
Page 164: ...Chapter 5 Removals service checks and adjustments 164...
Page 173: ...Table 24 Print quality sample 1 2 3 Chapter 5 Removals service checks and adjustments 173...
Page 246: ...Assemblies Chapter 6 Parts catalog 246...
Page 307: ...Taiwanese EMC Notices 307...
Page 310: ...Index Copyright IBM Corp 2002 310...
Page 311: ...IBMR Part Number 75P1301 Printed in U S A G544 5873 00 1P P N 75P1301...