Note: If a key is not pressed in approximately 10 seconds, an error message will be displayed. If a time out
error message occurs, press the Micro
↑
key once, then the Line Feed key to repeat T&D02
6. Continue to press the keys as each request is displayed.
7. If an error message is displayed, go to T&D error messages and actions.
8. The test completed successfully if the display advances to the next test number.
T&D03—Parallel attachment test
The parallel loop-back connector (PN 08H7269) needs to be installed for this test.
Note: If the loop-back connector is not installed, an error message will be displayed. To bypass this message,
press any key, then the Form Feed key to advance to the next test.
Display:
T&D03 Parallel Attachment Test RUN TEST ? YES END NO
If an error message is displayed, go to T&D error messages and actions. The test completed successfully if the
display advances to the next test number.
T&D04—Microcode test
Display:
T&D04 Microcode Test RUN TEST ? YES END NO
8
7
7
6
2
5
4
3
1
16
15
15
14
13
12
11
10
9
Figure 3. Operator Panel Key Press Sequence
Chapter 2. Diagnostics
105
Summary of Contents for V03
Page 24: ...Reference table 8 ribbon lift and 26 pin cable connectors 93 Chapter 1 Diagnosing problems 24...
Page 138: ...Operator panel cable wiring Chapter 3 Wiring diagrams 138...
Page 144: ...Tractor assembly cable wiring Chapter 3 Wiring diagrams 144...
Page 164: ...Chapter 5 Removals service checks and adjustments 164...
Page 173: ...Table 24 Print quality sample 1 2 3 Chapter 5 Removals service checks and adjustments 173...
Page 246: ...Assemblies Chapter 6 Parts catalog 246...
Page 307: ...Taiwanese EMC Notices 307...
Page 310: ...Index Copyright IBM Corp 2002 310...
Page 311: ...IBMR Part Number 75P1301 Printed in U S A G544 5873 00 1P P N 75P1301...