
© Copyright IBM Corp. 2004
25
Chapter 3. Installation
This chapter provides detailed instructions for installing the IBM TotalStorage SAN256N
director 2045-N16 hardware. SAN256N director hardware installation consists of the
following major steps, which are described in this chapter in the following sequence.
• “Moving and unpacking the equipment” on page 25
• “Chassis installation” on page 33
• “Cabinet installation” on page 39
• “Applying AC power” on page 41
• “Installing the Enterprise Manager workstation PC and external modem” on page 44
• “Installing Enterprise Manager” on page 48
• “Establishing Ethernet connections” on page 52
Note: The site preparation data sheets and worksheets described in the IBM
TotalStorage SAN n-type Director Series Site Planning Guide (GC26-7715) must
be completed before you can install the SAN256N director hardware.
Moving and unpacking the equipment
The following topics describe how to move and unpack SAN256N director equipment for
North American and international shipments.
North American shipments
When the SAN256N director is shipped within the United States and Canada, a
transportation carrier is used who specializes in moving and transporting electronic and
electronic ESD-sensitive equipment.
For detailed information describing the transportation carrier’s responsibilities, refer to
the IBM TotalStorage SAN n-type Director Series Site Planning Guide.
Moving the equipment
Refer to the SAN256N director Site Planning Grid for the customer’s building, floor, and
room destination for the SAN256N director. This worksheet is completed during the site
planning process.
The customer or shipping carrier (noted on the sales order) is responsible for
transporting the SAN256N director equipment to its final destination location at the
customer’s site, before removing the protective plastic shipping bag.
IBM recommends that a minimum of two people unpack and move the SANC40 cabinet.
Important: When the SAN256N director is shipped in conditions of extreme (high/low)
temperature and/or humidity, allow 24 hours for environmental stabilization of the
SAN256N director chassis and/or cabinet at room temperature. This 24-hour
environmental stabilization period must be accomplished in the room/area where the
installation will take place. The ESD bag/shipping materials must be removed to allow
proper environmental stability prior to the installation of the SAN256N director system.
Summary of Contents for TotalStorage SAN256N Director 2045-N16
Page 2: ......
Page 3: ...IBM TotalStorage SAN256N Director 2045 N16 Installation and Maintenance Guide GC26 7714 00...
Page 10: ...SAN256N Director 2045 N16 viii...
Page 12: ...SAN256N Director 2045 N16 x...
Page 18: ...SAN256N Director 2045 N16 xvi...
Page 26: ...SAN256N Director 2045 N16 6...
Page 84: ...SAN256N Director 2045 N16 64...
Page 94: ...SAN256N Director 2045 N16 74...
Page 120: ...SAN256N Director 2045 N16 100...
Page 142: ...SAN256N Director 2045 N16 122...
Page 144: ...SAN256N Director 2045 N16 124...
Page 156: ......
Page 157: ...Printed in USA GC26 7714 00...