![IBM TotalStorage IP Storage 200i 110 Installation Manual Download Page 20](http://html1.mh-extra.com/html/ibm/totalstorage-ip-storage-200i-110/totalstorage-ip-storage-200i-110_installation-manual_4113253020.webp)
4. Using the stickers provided on the rack-mounting template, mark holes on the
front and rear of the rack in the locations indicated by the arrows. The stickers
indicate where to place the clip nuts or cage nuts in the next step.
Note:
Position the template to the rack so that the edges of the template
do
not
overlap any other devices to be installed.
5. Insert the cage nuts using a screwdriver or the cage-nut-insertion tool or slide
on the clip nuts (as required for your rack) into all marked holes.
1
2
6. Use the pins on the slide rail to align the rail with the rack. Use the M6 screws
to secure the slide rail to the rack. Repeat this step for the other slide rail.
A
2
2
1
8
IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide
Summary of Contents for TotalStorage IP Storage 200i 110
Page 1: ...IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide GA27 4301 00...
Page 2: ......
Page 3: ...IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide GA27 4301 00...
Page 8: ...vi IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide...
Page 12: ...x IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide...
Page 52: ...40 IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide...
Page 58: ...46 IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide...
Page 68: ...56 IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide...
Page 86: ...74 IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide...
Page 90: ...78 IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide...
Page 93: ......