Appendix B. Blank planning worksheets
This appendix contains the following blank worksheets that you can use when you
plan the installation of a 3534 Model F08 in an operational environment:
v
Planning worksheet
v
Port configuration worksheet
v
Zone definition worksheet
v
Zone configuration worksheet
Make as many copies of the blank worksheets as you need to plan the installation
of your switches. Give your system administrator copies of the completed
worksheets.
For information about planning your installation, including examples of how to use
these worksheets, see Chapter 2, “Planning the installation” on page 5.
© Copyright IBM Corp. 2002
33
Summary of Contents for TotalStorage 3534-F08
Page 2: ......
Page 3: ...IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide SY27 7631 00...
Page 8: ...vi IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Page 10: ...viii IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Page 16: ...xiv IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Page 42: ...24 IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Page 56: ...38 IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Page 62: ...44 IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Page 79: ......
Page 81: ...Spine information IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...