![background image](http://html2.mh-extra.com/html/ibm/s822lc/s822lc_installing-the-system-and-ordered-parts_3362741021.webp)
4.
At the front of the rack, insert three pins on the front of the rail into the holes within the selected EIA
unit that were previously marked. Lower the slide rail down (1) to engage the hook feature on the
middle pin. For details, see Figure 4.
5.
While you pull the slide rail forward, ensure that all three pins protrude through the rack holes, then
push the front latch (2) all the way in. For details, see Figure 5 on page 6.
Figure 3. Opening the front latch
Figure 4. Pins that are seated on the front rail of the rack
Installing the IBM Power System S822LC (8335-GTA and 8335-GCA)
5
Summary of Contents for S822LC
Page 2: ......
Page 16: ...xiv Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Page 104: ...88 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Page 122: ...106 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Page 125: ...Figure 78 Connecting the power cord to the power supply Power supplies 109...
Page 126: ...110 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Page 138: ...122 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Page 139: ......
Page 140: ...IBM Printed in USA...