![background image](http://html2.mh-extra.com/html/ibm/s822lc/s822lc_installing-the-system-and-ordered-parts_3362741121.webp)
4.
Close the rack door at the rear of the system.
Figure 73. Power cord loop with cable management arm routing. The power cord loops counterclockwise to the right.
Figure 74. Power cord loop with sidewall routing. The power cord loops counterclockwise to the left.
Common procedures for servicing or installing features
105
Summary of Contents for S822LC
Page 2: ......
Page 16: ...xiv Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Page 104: ...88 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Page 122: ...106 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Page 125: ...Figure 78 Connecting the power cord to the power supply Power supplies 109...
Page 126: ...110 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Page 138: ...122 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Page 139: ......
Page 140: ...IBM Printed in USA...