Chapter 6. Installing Options
89
Installing a hot-swap expansion kit
To install a Netfinity 3-Pack Ultra160 Hot-Swap Expansion Kit:
Attention:
When you handle Electrostatic Discharge-Sensitive devices (ESD), take
precautions to avoid damage from static electricity. For details on handling these
devices, refer to the following Web site and search for ESD: http://www.ibm.com
1. Review the information in “Before you begin” on page 66 and in “Safety
information” on page 67.
2. Turn off the server and peripheral devices and disconnect all external cables and
power cords; then, remove the cover and bezel. (See “Removing the cover and
bezel” on page 72.)
3. Remove the filler panels from the bays below the CD-ROM drive.
4. Refer to the documentation provided with the option to assemble the hot-swap
expansion option.
5. Slide the hot-swap expansion option into the bays and attach it to the server with
the screws provided in the kit.
6. Refer to the documentation provided with the option to complete the installation
of the option. (See “System board internal cable connectors” on page 61 for
locations of the cable connectors on the system board.)
7. If you have other options to install or remove, do so now; otherwise, go to
“Installing the server cover and bezel” on page 92.
Filler panels
Hot-swap expansion option
Summary of Contents for Netfinity 4500R
Page 1: ...IBM IBM Netfinity 4500R User s Reference SC19 K080 60...
Page 2: ......
Page 3: ...IBM IBM Netfinity 4500R User s Reference SC19 K080 60...
Page 10: ...viii IBM Netfinity 4500R User s Reference Safety...
Page 32: ...20 IBM Netfinity 4500R User s Reference Using the SCSISelect utility program...
Page 70: ...58 IBM Netfinity 4500R User s Reference Netfinity Manager...
Page 118: ...106 IBM Netfinity 4500R User s Reference Input Output ports...
Page 192: ...180 IBM Netfinity 4500R User s Reference...
Page 196: ...184 IBM Netfinity 4500R User s Reference...
Page 197: ......