Tie wraps
Tie wraps
Power connection
Power connection
4. Use the M6 screws to secure the air duct brackets to the mounting rails. Torque
the screws to approximately 5.7 Nm +/- 0.1 Nm (50 inch-pounds).
Air duct mounting bracket
M6 screws
M3.5 screws
5. Use the M3.5 screws to secure the air duct mounting bracket to the rack
chassis. Torque the screws to approximately 2.0 Nm +/- 0.1 Nm (17.7
inch-pounds).
6. Gently slide the air duct unit side flanges into the card guides until the unit is
seated firmly. Make sure that the foam strip is oriented on top.
30
IBM System Networking RackSwitch G8124 and G8124-E: Installation Guide
Summary of Contents for BNT RackSwitch G8124
Page 1: ...IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 2: ......
Page 3: ...IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 7: ...DANGER Rack mounted devices are not to be used as shelves or work spaces L002 Safety v...
Page 9: ...Safety vii...
Page 14: ...xii IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 64: ...48 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 72: ...56 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 76: ...60 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 84: ...68 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 87: ......
Page 88: ...Part Number 00AY390 Printed in USA 1P P N 00AY390...