5. Use the M6 washers, screws, and clip nuts to attach the filler plate to the rear
mounting brackets. Torque the screws to approximately 5.7 Nm +/- 0.1 Nm (50
inch-pounds).
4
2
6
8
6. Use the M3.5 screws to secure the rear brackets to the front brackets. Torque
the screws to approximately 2.0 Nm +/- 0.1 Nm (17.7 inch-pounds).
9
10 11
3
7. Connect all the cables.
8. Initialize the switch, see Chapter 4, “Initializing the RackSwitch,” on page 43.
Attention:
If this is a switch replacement, make sure that the vital product
data (VPD) is updated to avoid losing the licensed electronic entitlement data of
the RackSwitch. For more information, see “Configuring Vital Product Data after
a switch replacement” on page 41.
Chapter 2. Installing the RackSwitch and options
27
Summary of Contents for BNT RackSwitch G8124
Page 1: ...IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 2: ......
Page 3: ...IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 7: ...DANGER Rack mounted devices are not to be used as shelves or work spaces L002 Safety v...
Page 9: ...Safety vii...
Page 14: ...xii IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 64: ...48 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 72: ...56 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 76: ...60 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 84: ...68 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 87: ......
Page 88: ...Part Number 00AY390 Printed in USA 1P P N 00AY390...