Powering down the device
1. Log in to the device as the admin user.
2. Back up the device configuration to an FTP server by entering the
configUpload
command and
following the prompts.
sb_70:admin> configupload
Protocol (scp, ftp, local) [ftp]:
Server Name or IP Address [host]: 192.168.0.100
User Name [user]: anonymous
Path/Filename [<home dir>/config.txt]: /dumps/supportsave/pz/switch85/G20-1.txt
Section (all|chassis|switch [all]): all
configUpload complete: All selected config parameters are uploaded
This command uploads the device configuration to the server, making it available for downloading
to a replacement device if necessary.
NOTE
If Virtual Fabrics (VF) is enabled, you must enter
configUpload
for each VF separately.
Powering down the device
Complete the following steps to power down the device.
1. Identify the power-on switches in the nonport-side of the device.
2. Power off both power supplies by setting each power switch to the “O” position.
3. Unplug the power cables from the power source before servicing the device or FRUs.
All devices are returned to their initial state the next time the switch is powered on.
58
Hardware Installation Guide
Summary of Contents for 8960-F64
Page 1: ...IBM 64 Port 32G Gen 6 Switch 8960 F64 8960 N64 Hardware Installation Guide...
Page 5: ...6 Hardware Installation Guide...
Page 9: ...Hardware Installation Guide 11...
Page 10: ...What s new in this document 12 Hardware Installation Guide...
Page 22: ...Shipping carton contents 24 Hardware Installation Guide...
Page 48: ...Attaching the rear brackets to the device 50 Hardware Installation Guide...
Page 64: ...Verifying the operation of new transceivers 66 Hardware Installation Guide...
Page 72: ...Running diagnostic tests 74 Hardware Installation Guide...
Page 100: ...Danger Notices 102 Hardware Installation Guide...