Establishing a first-time serial connection
For more information about how to interpret POST, BOOT, and diagnostics tests, refer to
Monitoring
the Device
on page 67.
Establishing a first-time serial connection
Perform the following steps to log in to the device through the serial connection.
1. Connect the serial cable to the serial port on the device and to an RS-232 serial port on the
workstation.
If the serial port on the workstation is RJ-45 instead of RS-232, remove the adapter on the end of
the serial cable and insert the exposed RJ-45 connector into the RJ-45 serial port on the
workstation.
2. Disable any serial communication programs running on the workstation such as synchronization
programs.
3. Open a terminal emulator application such as HyperTerminal on a Windows PC, or TERM, TIP, or
Kermit in a UNIX environment, and configure the application as follows:
• In a Windows environment
Parameter
Value
Bits per second
9600
Databits
8
Parity
None
Stop bits
1
Flow control
None
• In a UNIX environment using TIP, enter the following string at the prompt:
tip /dev/ttyb -9600.
If ttyb is already in use, use ttya instead and enter the following string at the prompt:
tip /dev/ttya -9600
4. When the terminal emulator application stops reporting information, press
Enter
to display the login
prompt.
Switch Console Login:
5. Log in to the device as admin, using the default password:
password
. You are prompted to change
the default admin and user passwords at initial login. Make sure to write down the new passwords
and keep this information in a secure location.
Fabric OS (swDir)
swDir login: admin
Password:
Please change your passwords now.
Use Control-C to exit or press 'Enter' key to proceed.
swDir:admin>
6. (Optional) Modify passwords. To skip modifying the password, press
Ctrl+C
.
52
Hardware Installation Guide
Summary of Contents for 8960-F64
Page 1: ...IBM 64 Port 32G Gen 6 Switch 8960 F64 8960 N64 Hardware Installation Guide...
Page 5: ...6 Hardware Installation Guide...
Page 9: ...Hardware Installation Guide 11...
Page 10: ...What s new in this document 12 Hardware Installation Guide...
Page 22: ...Shipping carton contents 24 Hardware Installation Guide...
Page 48: ...Attaching the rear brackets to the device 50 Hardware Installation Guide...
Page 64: ...Verifying the operation of new transceivers 66 Hardware Installation Guide...
Page 72: ...Running diagnostic tests 74 Hardware Installation Guide...
Page 100: ...Danger Notices 102 Hardware Installation Guide...