INSTALLATION AND OPERATION INSTRUCTIONS
1-14
SL 10-85 G3, SL 14-115 G3, SL 20-160 G3, SL 30-199 G3 MODULATING GAS BOILERS
SL 10-85 G3, SL 14-115 G3, SL 20-160 G3, SL 30-199 G3 MODULATING GAS BOILERS
1.4.7 “Direct Vent” Combustion Air Intake Piping
There are two basic methods of supplying combustion air to an IBC boiler.
The direct vent option uses piping from the outside to supply combustion air directly to the
boiler’s combustion air connection.
Table 4: Maximum intake piping length.
NOTE:
It is not permitted to add to the exhaust length by transfer of unused intake
allowance.
WARNING
In addition to preventing
ingestion of chemical
contaminants, care must be
taken to ensure air intake
terminals are not installed in
locations where contamination
might occur due to ingestion of
particulate foreign material (dust,
dirt and debris).
Figure 19: Direct vent combustion air intake
WARNING
Intake air openings must be
configured such that rain or
other forms of moisture cannot
enter the air intake piping
system. Otherwise serious
damage to the boiler may result.
NOTE
Care must be taken when
installing air intake piping to
ensure that a “trap” is not formed
in the piping so as to allow a
build-up of water, and blockage
of intake air.
Such blockage will result in a
boiler safety shut-down.
INTAKE PIPE SIZE
MAXIMUM EQUIVALENT LENGTH
Sched.40; Rigid PPs
SL 10-85 G3
SL 14-115 G3
SL 20-160 G3
SL 30-199 G3
2"
100'
100'
35’
Not applicable
3"
240'
240'
170’
150’
90° vent elbow
allow 8' equivalent
allow 8' equivalent
allow 8’ equivalent
allow 8’ equivalent
90° long sweep elbow
allow 5' equivalent
allow 5' equivalent
allow 5’ equivalent
allow 5’ equivalent
45° elbow
allow 3' equivalent
allow 3' equivalent
allow 3’ equivalent
allow 3’ equivalent
PPs 87-90° elbows
use 8' equivalent
use 8' equivalent
use 8’ equivalent
use 8’ equivalent
Air Intake Filter (Part #103)
allow 8' equivalent
allow 8' equivalent
2” Stainless Sidewall Terminal
IBC P/N 180-148 (P-256)
No additional
allowance
No additional
allowance
Not allowed
Not allowed
3” Stainless Sidewall Terminal
IBC P/N 180-149 (P-257)
No additional
allowance
No additional
allowance
No additional
allowance
No additional
allowance
Flexible PPs
3” Flexible
45’ (max.) lineal x 3.33
= equivalent
45’ (max.) lineal x 3.33
= equivalent
45’ (max.) actual
lineal x 3.33 =
equivalent
30’ (max.) actual
lineal x 3.3 =
equivalent
Summary of Contents for SL 20-160 G3
Page 75: ...6 3 DIAGRAMS SL 10 85 G3 SL 14 115 G3 SL 20 160 G3 SL 30 199 G3 MODULATING GAS BOILERS...
Page 77: ...6 5 DIAGRAMS SL 10 85 G3 SL 14 115 G3 SL 20 160 G3 SL 30 199 G3 MODULATING GAS BOILERS...
Page 79: ...6 7 DIAGRAMS SL 10 85 G3 SL 14 115 G3 SL 20 160 G3 SL 30 199 G3 MODULATING GAS BOILERS...
Page 85: ...SERVICE RECORD DATE LICENSED CONTRACTOR DESCRIPTION OF WORK DONE...
Page 86: ...NOTES...
Page 87: ...NOTES...