MAN048 ING
14
3.6.4
MOVE THE ENGINE ON THE RAILS AND
OPTIMIZE THE CHAIN TENSION .
ATTENTION:
THE PLAY OF THE CHAIN MUST BE APPR.
15mm (½÷¾ inch) MEASURED IN THE SHOWN
POINT (SEE FIG. 13)
3.6.5
TORQUE THE CLAMP SCREWS
INSTALL THE CLUTCH COVER
WITH H.T. COIL
3.7
REMOVE THE 3 SCREWS M6 X 30 ON THE
CRANKCASE (SEE FIG. 14) AND INSTALL THE
CLUTCH COVER WITH H.T. COIL (SEE FIG.15).
TORQUE THE 3 SCREWS AT 8 ÷ 10 Nm
(70 ÷ 90 inlb)
ATTENTION:
ALWAYS MAKE SURE THAT THE GROUND
CABLE ALWAYS CONNECTS THE COIL WITH
THE ENGINE. AN INADEQUATE GROUNDING
COULD DAMAGE THE IGNITION BEYOND
REPAIR.
THE POSITION OF THE H.T. COIL HAS BEEN
CHOSEN TO BE AS FAR AS POSSIBLE FROM
THE EXHAUST AS THE EXCESSIVE HEAT
COULD DAMAGE THE COIL BEYOND REPAIR.
5 mm ALLEN
Fig.13
Fig.14
15mm
Fig.15
Summary of Contents for Parilla Leopard TaG Series
Page 46: ...MAN 048 ING 44...