9
Workmaster C Series 2 Pedestal Cabinet Assembly:
Item
Description
Qty
1
Worksurface
1
2
Support Beam Assy Front
1
3
Support Beam Assy Rear
1
4
Cabinet Pedestal Sub-Assy
2
HARDWARE KIT #HWR006
A
1/4-
20x3/4” Hex Head Bolt
20
B
1/4 Flat Washer
20
C
Floor Glide 5/16-18
8
D
Screw, #14 X 1.00 PPH SMS Black
8
HARDWARE KIT #HWR021
E
Ratchet Plug Cap Black
12
Step 1:
Place worksurface topside down on smooth flat surface being sure to protect it from damage by foreign
objects. IAC recommends the use of packing type blankets or clean cardboard. Refer to page 7 Step 2 for
instructions to removed the drawers from the pedestal cabinets.
Step 2:
Carefully turn the pedestal cabinets up side down and position them onto the worksurface and align them with
the inserts in the worksurface. Attach the pedestal cabinets to the worksurface using the 1/4-20 x .75 hex
head bolts and 1/4 flat washers as shown. Do not tighten hardware at this time.
Step 3:
Install the support beams to the pedestal cabinets using the #14 X 1.00 screws and 1/4 flat washers as
shown. Adjust the position of the pedestal cabinets making sure the overhang of the worksurface is equal on
each end. Tighten hardware at this time being sure not to over tighten the bolts attaching the pedestal
cabinets to the worksurface. If you have purchased items such as footrests, lower metal shelves or CPU
holders please see pages 17-26 for assembly instructions.
Step 4:
Install floor glides into pedestal cabinet base. With the help of at least another person carefully roll the
workbench right side up. Install the drawer bodies into the pedestal cabinets in their original locations.
Step 5:
Use the Ratchet Plug Caps found in hardware kit 021 to cover all open holes in the cabinets.