6-27
Position valve assembly with the mounting
pads of the end sections on a flat surface.
To obtain proper alignment of end sections
relative to the spool sections apply
downward pressure to the end sections ;
Snug tie rod nuts to about 10lbf ft.
Final torque the two 11/16 nuts to 48
5lbf ft ; Final torque the 3/4 nut to 74
8lbf ft. Check for proper spool movement.
5)
Install auxiliary valves and plugs and torque
to proper specifications.
General assembly notes:
A. Lever assemblies can be installed on
section before or after complete valve
assembly.
B. The load check and spring may be
omitter from assembly in certain circuit
conditions(i.e., motor spools).
6)
7406S MCV06(1)
7406S MCV06(2)
https://www.forkliftpdfmanuals.com/
Summary of Contents for HDF 50-7S
Page 2: ...https www forkliftpdfmanuals com ...
Page 282: ...7 3 2 HDF50 70 7 https www forkliftpdfmanuals com ...
Page 283: ...7 3 MEMORANDUM https www forkliftpdfmanuals com ...
Page 316: ...https www forkliftpdfmanuals com ...
Page 318: ...https www forkliftpdfmanuals com ...
Page 330: ...https www forkliftpdfmanuals com ...
Page 353: ...3 1 SERVICE TOOLS 1 Special tool 3 2 https www forkliftpdfmanuals com ...
Page 360: ...https www forkliftpdfmanuals com ...
Page 378: ...https www forkliftpdfmanuals com ...
Page 408: ...https www forkliftpdfmanuals com ...
Page 428: ...https www forkliftpdfmanuals com ...
Page 506: ...ELECTRICAL SYSTEM 12 28 Installing alternator S6S Y3T62HF https www forkliftpdfmanuals com ...
Page 508: ...https www forkliftpdfmanuals com ...