6-30
PUMP 23
Gently slide the gear housing over the rear
bearing block assembly, slide housing
down until the housing engages the dowel
pins. Press firmly in place with hands, do
not force or use any tool.
Check to make sure the intake port in the
housing in on the same side as the open
end of the E-seal and that the marked
lines on the mounting flange and gear
housing are in alignment.
The surface of the rear bearing block
should be slightly below the face of the
gear housing. If the bearing block sits
higher then the rear face of the gear
housing then the E-seal or O-ring have
shifted out of the groove. If this is the
case, remove the gear housing and check
for proper seal installation.
(13)
(14)
PUMP 24
Install the two remaining dowel pins in the
rear of the gear housing and place the
end cover over the back of the pump.
(15)
PUMP 25
Install the four spacers and hexagon head
bolts through the bolt holes in the end
cover, hand tighten.
(16)
Summary of Contents for 20G-7
Page 1: ......
Page 2: ......
Page 3: ......
Page 6: ......
Page 41: ...2 7 Mast Refer to the chapter 1 MAST Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Page 59: ...3 7 OPERATING MODES Forward INPUT OUTPUT 4 1 INPUT OUTPUT 20D7PT29 20D7PT30 Reverse 2 ...
Page 231: ...7 3 FUEL SYSTEM CIRCUIT TIER 3 LPG 20L7EL07 ...
Page 232: ...7 4 FUEL SYSTEM CIRCUIT TIER 3 BI FUEL 20L7EL06 ...
Page 233: ...7 5 FUEL SYSTEM CIRCUIT NON CERT LPG 20L7EL08 ...
Page 234: ...7 6 FUEL SYSTEM CIRCUIT NON CERT BI FUEL 20L7EL09 ...
Page 235: ...7 7 MEMORANDUM ...
Page 267: ...MODEL L4GC SHOP MANUAL FOR INDUSTRIAL USE ...
Page 284: ...GENERAL 2 1 GENERAL OUTLINE L4GC001A ...
Page 285: ...GENERAL 2 2 L4GC002A ...
Page 346: ...LUBRICATION SYSTEM 2 63 4 Front case Oil pump 5 Timing belt 6 Timing belt cover ...
Page 390: ...3 21 5 Loosen 4 through bolts L4GC330A L4GC048A 6 Separate the rotor and cover CHARGINGSYSTEM ...
Page 402: ...1 GENERAL 4 1 2 INJECTOR 4 14 4 PVC VALVE 4 16 CHAPTER 4 FULE SYSTEM AND OTHER ...
Page 420: ......