3-63
Fasten RING BRG ADJUST.
20D7AXLE065
20D7AXLE066
20D7AXLE067
Paint marking(Both sides)
20D7PT35
Measure backlash again.
Bachlash of pinion shaft and ring gear is 0.15~0.2mm
(0.006~0.008 in)
If backlash is wrong, carry out adjusting work.
Adjust the left / right of RING BRG ADJUST by one
and one clip.
Fit position.
Assemble cotter pin.
60%
40~75%
40~75%
60%
40%
40%
Heel
Toe
Toe
Heel
Drive side(Forward)
Coast side (Reverse)
20D7PT37
After assembling, adjust pattern of the gear and
pinion shaft as figure.
If pattern is not adjusted, take a measure as
measuring backlash again and then reassemble.
Summary of Contents for 20G-7
Page 1: ......
Page 2: ......
Page 3: ......
Page 6: ......
Page 41: ...2 7 Mast Refer to the chapter 1 MAST Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Page 59: ...3 7 OPERATING MODES Forward INPUT OUTPUT 4 1 INPUT OUTPUT 20D7PT29 20D7PT30 Reverse 2 ...
Page 231: ...7 3 FUEL SYSTEM CIRCUIT TIER 3 LPG 20L7EL07 ...
Page 232: ...7 4 FUEL SYSTEM CIRCUIT TIER 3 BI FUEL 20L7EL06 ...
Page 233: ...7 5 FUEL SYSTEM CIRCUIT NON CERT LPG 20L7EL08 ...
Page 234: ...7 6 FUEL SYSTEM CIRCUIT NON CERT BI FUEL 20L7EL09 ...
Page 235: ...7 7 MEMORANDUM ...
Page 267: ...MODEL L4GC SHOP MANUAL FOR INDUSTRIAL USE ...
Page 284: ...GENERAL 2 1 GENERAL OUTLINE L4GC001A ...
Page 285: ...GENERAL 2 2 L4GC002A ...
Page 346: ...LUBRICATION SYSTEM 2 63 4 Front case Oil pump 5 Timing belt 6 Timing belt cover ...
Page 390: ...3 21 5 Loosen 4 through bolts L4GC330A L4GC048A 6 Separate the rotor and cover CHARGINGSYSTEM ...
Page 402: ...1 GENERAL 4 1 2 INJECTOR 4 14 4 PVC VALVE 4 16 CHAPTER 4 FULE SYSTEM AND OTHER ...
Page 420: ......