Are no more than 8 nozzles connected to one vac-
uum valve?
Are the hoses from the atomisation air supply to the
pilot valve no longer than 20 m?
Are all hoses secure and straight in the connectors?
Have the hose lines been laid with at least 50 mm
spare length per meter?
Have the electrical connections been made accord-
ing to the wiring diagram?
Are water and air filters correctly inserted and
secure?
After Nozzle System Startup:
Are the nozzles switched on and off correctly by the
hygrostat (and max. hygrostat)?
Do the nozzles close properly when humidification is
not required?
Are no objects or obstacles being sprayed?
Summary of Contents for CU-1
Page 1: ...Atomising Vacuum Nozzle System Manual...
Page 37: ...Page 37 5 4 Example of Installation Fig Example of installation a VN Unit with 4 nozzles...
Page 38: ...Page 38 Fig Example of installation a VN Unit with 8 VN nozzles and 2 vacuum valves...
Page 48: ...Page 48 10 EC Declaration of Conformity...
Page 54: ...Page 54 General 39 Water Installation 39 Wiring Diagram 42...