Caution!
It is to be guaranteed that the plant board is kept closed whilst in
operation!
The control box and reactor board doors shall be opened by
authorized personnel only for repair and maintenance work!
3. Commissioning record
Attached to the O&M is a commissioning and instruction record (see annex 3). Such record has to
be duly filled by the service staff after commissioning and start up.
A complete and duly filled commissioning record and operational log book is necessary and
must be guaranteed since otherwise any warranty claims cannot be accepted.