Starting up the unit
LVU-CD-10
en(us)
Page 31 / 52
BeWa LVU-CD-10 Eco 4067271 en-us 2016-01-08.doc
2016-01-08
Starting up the unit
NOTICE
Leakage on the unit
Environmental hazard / the collecting pan is overflowing
►
Monitor the unit during operation.
►
In the case of leaks, switch the unit off and eliminate leaks.
Proceed as follows to commission the unit:
1.
You have performed all preparations outlined in chapter "Unit
setup/connection" on pages 23 to 28.
2.
Switch on the unit at the main switch (21) and monitor the
suction/pump characteristics of the unit.
3.
If the unit does not pump any fluid after more than 3 minutes of
operation, switch off the unit.
Check installation and refill the unit as described in chapter "Pre-filling /
filling the unit" on page 28.
4.
Monitor the unit during operation.
Summary of Contents for LVU-CD-10
Page 51: ......