CTU in operation
Automatic cleansing of the analysis chamber
The door to the analysis chamber must remain closed during the
entire rinsing process.
The automatic cleaning of the inner chamber causes the inner walls of the
CTU to be cleansed in a defined manner. The nozzle to clean the inner
chamber is located in the middle of the analysis chamber.
For controlling, please refer to the ConTeS operating manual.
CTU 1x3x Series
en(us)
Page 46 / 92
BeWa CTU1x3x 3631694d en-us 2017-03-13.docx
2017-03-13