Performing inspection / maintenance
Adding / Filling test liquid
To add test liquid, follow all instructions and the following procedure.
NOTICE
Overfilling the reservoir
The CTU does not work.
►
Add only the required indicated fill quantity for the test liquid.
►
If the tanks are overfilled, drain the test liquid as described on page
Before adding liquid, calculate the maximum fill quantity according to the
following formula:
Fill quantity during initial filling
20 liter
Fill quantity when topping off
19 liters
Content (reservoir B1) – Content
(reservoir B2)
Start the "Fill system" operation in the CTU software and follow the
instructions.
Fill the system with test liquid as described below:
1. Start the "Fill system" operation.
For controlling the process, please refer
to
"ConTeS User's Guide"
2. Select the tank to be filled.
Owing to the
design of the
CTU, the level sensor in the reservoir
does not capture the reservoir bottom.
As a result, a reservoir content of 1 liter
is shown in the CTU software.
3. Pour the previously determined and
measured test liquid into the analysis
chamber of the CTU.
Maximum capacity is
approx. 20 liters.
CTU 1x3x Series
en(us)
Page 69 / 92
BeWa CTU1x3x 3631694d en-us 2017-03-13.docx
2017-03-13