Checking the scope of delivery
Checking the scope of delivery
The ContaminationTest Unit comes packed and partially factory-assembled.
Before starting up the CTU, check the delivery to make sure that it is
complete and undamaged.
The following items are supplied:
Item Qty
Designation
1
1
Contamination Test Unit
2
1
PC, pre-installed
3
1
Monitor including holder or foot.
4
1
Keyboard with touchpad
5
1
Foot switch with 1 m cable including plug
6
1
Four-sided hollow socket key, 6 mm
7
2
Gloves
-
1
Support screen for membrane retainer
-
1
Software, drivers, license
-
1
Technical documentation consisting of:
- Instruction and maintenance manual (this document)
- ConTeS instruction manual
- Electrical circuit diagram
- Hydraulics circuit diagram
- Declaration of conformity, certificates, etc.
CTU 1x3x Series
en(us)
Page 21 / 92
BeWa CTU1x3x 3631694d en-us 2017-03-13.docx
2017-03-13