Unpacking the unit
CMP1000
en(us)
Page 15 / 44
MoWa CMP 3528418d en-us 2015-01-06.doc
2015-01-06
Unpacking the unit
The CMP is inspected for leaks and proper functioning at the factory, then
carefully packed for shipment. The connectors are closed off so that no
contamination can enter the unit while it is in transit.
When receiving and unpacking the unit, check it for damage in transit.
Dispose of the packaging material in an environmentally friendly manner.
Storing the unit
Rinse and drain the unit completely before putting it into extended storage.
Make sure to store the CSM in a clean, dry place.