User Manual
HV Diagnostics
Page 42
Rev 9.0
“View Reports”. Reports are listed according to date, with the first entry
corresponding to the latest report saved.
When a report is selected, the screen header indicates:
“Reference # of report in view / Total number of reports saved”.
The upper right-hand corner displays:
“Page # in view / Total number of report pages”.
Main Menu
USB
Use Last Test Seq.?
3.0kV Maint. C. HYBR (T)
(T)
Start a New Test
Manual Mode
Reports & Setup
13.3.2009 10:23
Reports &Setup
Reports & Setup
View Reports (2)
Store Rep. to USB
Edit Auto Test Seq.
Instrument Settings
Display Contrast 4
Service
USB
MAIN
View Report 2/2.
ALPHA
ALPHA 2
MAIN
SELECT DEL CLR-ALL
1/3
Main Menu
Rep. 2/2
Page 1/3
Report 2/2
Page 1/3
Report 2/2
Page 1/3
View Report 2/2.
MAIN
SELECT DEL CLR-ALL
3/3
ALPHA Ph: RED
18.3.2009 14:18
1.0kV Cable XPLE
Maintenence Test Interrupted
Comp: HV
Region: CHEROKEE
Station: BETA1
Oper.: J.SMITH
W.Order: WOO9A
ALPHA Ph: RED
Len.: 200 m Size: 4/0
Manuf.: ABC
Test Voltage: 13.0kVrms
Duration: 15min
Waveform: Sine 0.1Hz
Test Interrupted
at step 1 after 0min.
by user stop
ALPHA Ph: RED
Measurements:
Load: 57.1nF , 348M
Ω
S1: 32,5kV 250µA 0.1Hz
View Report 2/2
View Report 2/2
1/3
2/3