![Hussmann DD5X5FRW Installation & Operation Manual Download Page 19](http://html.mh-extra.com/html/hussmann/dd5x5frw/dd5x5frw_installation-and-operation-manual_2189907019.webp)
Roll-In
P/N 3053878_B
1-13
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
CART GUIDE INSTALLATION
(Optional Kit
)
1. Place cart guide hole templates on the floor as shown below.
2. Drill
3
/
8
inch diameter holes in the concrete 1
1
/
2
inches deep. Leave the template in place while drilling
the holes. Clean out concrete dust from holes.
3. Place
1
/
4
inch concrete anchors in the 1
1
/
2
inch deep holes.
4. Take the cart guides and cart guide gasket out of the packout bag.
5. Remove the tape liner on the cart guide gasket, and mount the gasket onto the cart guide.
GD
F
3.
0
SH
EE
T
SI
ZE
D
NOTES:
1. APPLICABLE STANDARDS / SPECIFICATIONS
ASME Y14.5M-1994, DIMENSIONS AND TOLERANCES
2. KEY PRODUCT CHARACTERISTICS PER EPR-0006 & IDENTIFIED WITH SYMBOL
3. MATERIAL-
4. REF -
K
SHEET 5 OF 11
P/N
REV
THIRD
ANGLE
PROJECTION
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES.
R
Cart Guide Installation
25. Place cart guide hole templates on the floor as shown in figure xxxx.
26. Mark the holes and remove the cart guide hole template.
27. Drill 3/8 diameter holes in the concrete.
28. Place concrete anchors in the holes.
29. Take the cart guides and cart guide gasket out of the box.
30. Remove the tape liner on the cart guide gasket and mount the gasket onto the cart guide.
31.
Place the cart guides on the floor and fasten with a washer and bolt.
K
Drill Locations
K
Drill Locations
Line up with
Upright Base
Cover
Line up front
edge to Door
Base Plate
Cover
Line up Upright
Base Cover
Cart Guide
Cart Guide
Gasket
Drill Locations