6 FORK, TRIPLE CLAMP
42
F00054-12
-
Using a plastic hammer, tap lightly on the upper triple clamp
to avoid stresses.
- Tighten screws
fD.
Guideline
Screw, top triple
clamp
M8
17 Nm (12.5 lbf ft)
-
Secure the wiring harness with cable holder
@)
on the left.
-
Mount indicator lamp holder.
Guideline
Remaining screws,
chassis
M6
10 Nm (7.4 lbf ft)
-
Position the brake caliper. Mount and tighten screws Qi).
Guideline
Screw, front
brake caliper
M8
25 Nm (18.4 lbf ft)
Loctite
®
243
™
-
Position the brake line and the clamp. Mount and tighten
screws
a..
Finishing work
-
Install front fender. (
8
p. 113)
-
Install the start number plate. (
8
p. 114)
-
Install the front wheel. (
8
p. 119)
-
Check that the wiring harness, throttle cables, and brake and
clutch lines can move freely and are routed correctly.
-
Check steering head bearing play. (
0
p. 42)
-
Remove the motorcycle from the lift stand. (
0
p. 12)
-
Mount the handlebar cushion.
Checking steering head bearing play
Warning
Danger of accidents
Incorrect steering head bearing play impairs the handling characteristic and
damages components.
-
Correct incorrect steering head bearing play immediately.
Info
If the vehicle is operated for a lengthy period with play in the steering head bearing, the bearings and the
bearing seats in the frame can become damaged over time.
Preparatory work
-
Raise the motorcycle with a lift stand. (
8
p. 12)