INSTALLATION
— Outside Mount
9
Install the Shade into the Headrail
Prepare the Optional Return(s)
■
If you ordered optional return(s), insert the
return(s) into the bottom of the secondary rail(s).
➤
Slide the return into the channel on the
secondary rail until it is flush with the
bottom end cap.
➤
The entire return is illustrated in the
“Product Views” on pages 1 and 2.
■
Insert the stabilizer plate and snaplock into the bottom of
the secondary rail(s).
➤
Slide the stabilizer plate into the channel on the
secondary rail as shown.
➤
Install the snaplock into the channel under the stabilizer
plate to hold the stabilizer plate in place.
Insert the Primary Moving Rail Trike into the Headrail
NOTE:
With split stack designs, fully complete the installation of one shade panel before
starting the second panel.
■
Review the illustration showing the channels where the trike rollers and fabric carrier rollers
fit into the headrail.
■
With the front of the fabric facing you, locate the
primary moving rail trike.
➤
Insert the trike’s side rollers into the
headrail, as illustrated.
IMPORTANT:
Be sure the cords are routed
to the outside of the trike before sliding the
trike side rollers into the headrail. Be careful
not to pinch the cords.
NOTE:
One cord anchor is attached to each
of the three cords. With side stack designs,
the cords are routed through the headrail
end cap.
➤
Install the first fabric carrier roller after the trike side rollers, before sliding on the top
roller on the end of the trike.
➤
After installing the first fabric carrier roller, continue sliding the trike into the headrail
until the top roller on the end of the trike fits under the center channel.
Return
Bottom
End Cap
Slide Return
into Channel
Trike
First Fabric
Carrier Roller
Trike
Rollers
Fabric
Carrier
Rollers
Front of
Headrail
Cords
Moving
Rail
Back of
Secondary
Rail
Stabilizer
Plate
Snaplock
Summary of Contents for Vignette EasyRise
Page 47: ......